RTG 03 and RTG 07 port cranes
Back to projects

RTG 03 and RTG 07 port cranes

Live port environment, zero disruption to operations.

Key figures
25 mHeight
2 unitsUnits
10 daysDuration
100%Recycling

From start to finish. No surprises.

Every project follows a documented, step-by-step process. These are real photos of this dismantling job.

01
BeforeStarting point
RTG port cranes in the port before dismantling
Before

RTG port cranes in the port before dismantling

02
DuringWork in progress
Port crane being dismantled with an auxiliary crane
During

Port crane being dismantled with an auxiliary crane

03
AfterEnd result
Recovered material loaded onto lorries for transport to the recycling plant
After

Recovered material loaded onto lorries for transport to the recycling plant

Dismantling of two 25-metre-high RTG (rubber-tyred gantry) port cranes at a commercial port in full operation. The main challenge was coordinating the work without affecting day-to-day port operations.

We worked in coordination with the port authority, marking out safety zones and operating in time windows that fitted around port activity. The cranes were dismantled in sections with an auxiliary crane and oxy-fuel cutting. All the structural steel was recovered.

Project challenges

1A commercial port in full operation
2Two cranes, each 25 metres high
3A maximum of 10 days for both units
4Strict port safety restrictions

Do you have a similar project?

Request information and find out how we can help with your next dismantling project. Fixed-price quote within 48 hours.