Industrial storage tank
Back to projects

Industrial storage tank

Carried out with a mobile crane, with all the metallic material recovered.

Key figures
30 mHeight
1,410 m³Volume
15 daysDuration
100%Recycling

From start to finish. No surprises.

Every project follows a documented, step-by-step process. These are real photos of this dismantling job.

01
BeforeStarting point
Industrial tank before dismantling — the full 30-metre structure
Before

Industrial tank before dismantling — the full 30-metre structure

02
DuringWork in progress
Dismantling in sections with a mobile crane
During

Dismantling in sections with a mobile crane

03
AfterEnd result
Clear site after the tank was completely removed — 100% of the material recycled
After

Clear site after the tank was completely removed — 100% of the material recycled

Complete dismantling of a 30-metre-high industrial storage tank with a capacity of 1,410 m³ at a chemical plant. The project called for exhaustive planning because it was close to live installations and there were chemical residues inside.

We used a heavy-duty mobile crane to dismantle the tank in sections from the top down. Once the tank had been decontaminated, it was cut with oxy-fuel cutting equipment and removed in controlled sections. All the metallic material was sorted and transported to our recycling plant.

Project challenges

1Close to installations in live production
2Chemical residues inside the tank
3A height of 30 metres that required special equipment
4The need to recover 100% of the metallic material